Integration & tooling

GTI — Tile Interface

Data, management, test, analog, power/clock/reset and security service boundary

Architecture IP
Request evaluation
GTIIntegration & tooling
THE TECHNICAL ROLE

A clear integration boundary.

GTI — Tile Interface integration role: Tenant/substrate contract. Documented composition: Data, management, test, analog, power/clock/reset and security service boundary.

01

management

02

analog

03

power/clock/reset and security service boundary

TECHNICAL OVERVIEW

The details matter.

Download the product brief
Canonical identity
IP-112
Responsibility
Tenant/substrate contract
Documented building blocks
Data, management, test, analog, power/clock/reset and security service boundary
Delivery boundary
Architecture
Evidence scope
Architecture IP
Architecture IP

Know the release.
Know what it establishes.

Canonical technology and its architecture/integration role are recorded. The offered delivery is confirmed against the exact release before licensing.

Source basis: Bible v7.42 IP-112. This is a controlled-portfolio summary, not a fresh execution of the chip qualification flow.

Release-specific qualification

No node-port, silicon-performance, standards certification or analog qualification is inherited from a related product.

Canonical record: Build specification

A PATH THAT FITS THE PROJECT

Build with GTI — Tile Interface.

Technical scope, rights, support and release configuration are agreed before delivery.

evaluation

Evaluate an individual IP configuration

Inspect the named release and establish technical fit.

Discuss this scope
production

Named-design production license

Agree deployment or design rights, deliverables and support.

Discuss this scope
custom

Node binding or derivative integration

Define the customer-specific work and acceptance criteria.

Discuss this scope

Keep exploring.

Integration & tooling

GSH-130D

Digital user socket; GFI; management; reset isolation; DMA; trace; DFT; GPIO/debug; physical contract.

Qualified release
IP-003 · Controlled physical release
Integration & tooling

GSH-AS — Silicon Harness Active Substrate

GTI/GTG; data, management and lifeboat fabrics; analog service; power/clock/reset; security/RAS; GDI

Controlled physical release
IP-111 · Controlled physical release
Integration & tooling

GCF — Continuum Fabric

Physically homogeneous GCE array; mixed-signal compile; partial reconfiguration; self-characterization/self-healing

Architecture IP
IP-122 · Architecture / contract

Your next big idea.
Let’s build it together.

Start with a chip, a software release or a single IP block.

CANONICAL EVIDENCE RECORD · IP-112

Architecture / contract

Architecture or interface scope is documented; release qualification must be bound before delivery.

Source: Bible 7.42 VERIFIED V29 · PART XII - MASTER NAMED IP INVENTORY ADDENDUM · table 551, row 26.

Record integrity and qualification boundary

816baac3f07403feacfa19f5b32904354bf0bfd960bb5a61eb8c698df4d4f397

Evidence ranking for evaluation prioritization; not a probability or certification.

How evidence priority is determined ↗